Port Salford Greenway
Client: Salford City Council
Value: £320,000
This project was undertaken to upgrade the existing footpath from Blantyre Street to Barton Road in Worsley to a new flexible paving cycleway with new feature gateways and signage. Our works comprised of:
- Removal of existing chicane access barriers and installation of gateway features
- The construction of a ‘Tiger’ Crossing
- The installation of a 3m wide path (50/50 mix recycled tyre/aggregate porous surface laid on 150mm MOT base)
- Installation of a new fence
- Installation of street furniture including litter bins and signage
- Stump grinding
- Replacement of a footbridge over the stream